Mfg Current Activities
The data model includes measures of actual and planned quantities, run hours, and set hours for manufacturing activities. It focuses on monitoring and analyzing production metrics, quality analysis, inventory forecasting, downtime analysis, cost analysis, and capacity utilization for manufacturing operations. Measures like Quantity TD, Run Hours TD, and Set Hours TD reflect actual operational data, while Quantity Req STD, Run Hours STD, and Set Hours STD represent planned targets for manufacturing activities, supporting performance evaluation and continuous improvement efforts.
Benefits of This Data Model
- Improved Production Analysis: Enhances the ability to analyze actual and planned quantities, run hours, and set hours for manufacturing activities, enabling detailed production analysis and performance evaluation.
- Enhanced Quality Insights: Facilitates in-depth quality analysis by providing insights into quality data trends, root causes, and improvement opportunities, leading to better quality control in manufacturing processes.
- Optimized Inventory Management: Supports effective inventory forecasting based on historical data and production plans, aiding in proactive inventory management and minimizing stockouts or excess inventory.
- Increased Operational Efficiency: Enables downtime analysis to identify machine downtime causes and impacts on production efficiency, leading to targeted improvements and enhanced operational efficiency.
- Advanced Cost Control: Empowers cost analysis by analyzing cost drivers, profitability, and cost-saving opportunities, facilitating better decision-making for cost control and efficiency enhancement in manufacturing activities.
Key Performance Indicators (KPIs)
- Quantity Req STD: The standard quantity required for a manufacturing activity.
- Quantity TD: The actual quantity produced or used during a manufacturing activity.
- Run Hours TD: The actual number of hours the equipment or machinery was operational during the manufacturing activity.
- Run Hours STD: The planned number of hours the equipment or machinery should be operational for the manufacturing activity.
- Set Hours TD: The actual number of hours spent setting up the equipment for the manufacturing activity.
- Set Hours STD: The planned number of hours allocated for setting up the equipment for the manufacturing activity.
Available Visualizations
| View Name | Description |
|---|---|
| Mfg Production Dashboard | Displays real-time production metrics and performance indicators for manufacturing operations. |
| Mfg Quality Analysis | Analyzes quality data to identify trends, root causes, and opportunities for improvement in manufacturing processes. |
| Mfg Inventory Forecast | Forecasts inventory levels based on historical data, production plans, and supply chain dynamics in manufacturing. |
| Mfg Downtime Analysis | Provides insights into machine downtime, its causes, and impacts on production efficiency in manufacturing operations. |
| Mfg Cost Analysis | Analyzes cost drivers, profitability, and cost-saving opportunities in manufacturing activities. |
| Mfg Capacity Utilization | Tracks and optimizes the utilization of production capacity to improve efficiency and resource allocation in manufacturing. |